State-of-the-art raised floored data centre in Stratford,
London.
The facility offers complete redundancy in protected
power, HVAC, fire suppression, network connectivity
and on-site manned security.
The facility takes power feeds from multiple power
grids, distributed via MGE UPS battery backup power
and three 2.5 MVA Caterpillar diesel generators to backup
primary power source with 48-hour on-site fuel storage
supported by continuous refuelling contracts.
Libert HVAC systems are configured to provide cooling
redundancy in a temperature controlled environment.
Fire suppression includes a dry pipe pre-action system
with VESDA (Very Early Smoke Detection Apparatus)
sta.lon Stratford, London
- 7,000 sq.ft facility
- 6,000 sq.ft of raised floor
- (5) 26 ton
Libert AC units
- Dry pipe pre-action sprinkler
system
- Very Early Smoke Detection
Apparatus (VESDA)
- 4500+ amps of input power
- (2) 500KVA MGE UPS units
- (3) 2.5 MVA Caterpillar diesel
generators
- Three point fibre duct enternace
- BMS monitoring software for
all data center infrastructure
Network Infrastructure
Juniper M Series routers at the border, Cisco Catalyst
7600 series in our core switching layer and Cisco 3550/3750G
series switches in our distribution layer.
At our customer layer we utilize Cisco 3500 and 2950
series switches.
Juniper M Series border routers Cisco Catalyst 7600
Series core routing switches Cisco 3550/3750G distribution
switches
99.9% uptime availability
|